Webgranular borrow s.p. station to station total excavation total embankment include 2629 cu yd of topsoil excavation. embankment (cu yd) common 6862 (ev) = 1315 (cv) 9220 (ev) 1171 (cv) topsoil subgrade 2358 (ev) = 5493 (cv) 878 (cv) topsoil borrow special 1 5278 (cv) suitable grading WebPlace granular borrow behind abutment in 1’-0" layers. Thoroughly compact each layer. Excavated material may be used if suitable. Place two ~9" layers of gravel borrow. Thoroughly compact each layer. Finish to match new cross section, transition with existing approach roadway. 1’-0" L Remove existing deck, superstructure and log abutments ...
OPINION OF PROBABLE COST - Cottage Grove, MN
WebJan 1, 2024 · 1. Granular Backfill Borrow, Classification A-1. Refer to AASHTO M145. a. Well-graded material. b. Maximum aggregate size is 1½ inches for plastic pipe, 2 inches for all other pipes. 2. Flowable fill. Refer to Section 03575. a. Use only for drainage pipe … WebGravel Borrow. Choose a Type. PRODUCT CODE: 1980-3. PRODUCT ORIGIN: King Creek Pit and Kapowsin Quarry. GET A QUOTE. Info. Pricing. residential projects. free-draining structural fill. fix based operator
208 Borrow - Wisconsin Department of Transportation
Web203.32 granular borrow cy $19.75 26 203.40 shoulder berm removal lf $0.30 42 204.20 trench excavation of earth cy $18.03 110 204.21 trench excavation of rock cy $139.85 59 204.22 trench excavation of earth, exploratory (n.a.b.i.) cy $74.84 278 204.25 structure excavation cy $24.11 99 204.30 granular backfill for structures cy $45.29 136 WebMnDOT Standard Specifications for Construction 2024 Volume II - Division II (PDF) The 2024 edition is effective for most projects let on or after Jan. 27, 2024. All project documents submitted for the Jan. 27, 2024 letting, or later lettings, must be in accordance with the Standard Specifications for Construction, 2024 edition. Web209 Granular Backfill 209.1 Description (1) This section describes furnishing processed or selected granular materials, where the plans designate, ... If measured in its original position, the department will calculate the quantity as specified for borrow in 208.4.2. Prepare the pit for measurement as specified in 209.2.4. can lipoma disapar on their own